| June 21, 2007 |
| Horizontal Stabilizer |
![]() |
| Notice the time lapse between my last step and this one. I needed an elevator length before drilling these hinges on the HS, so I had to wait until now in order to do this. ( I am now still working on the elevators, but was able to get a length for the hinges.) Here is me making sure I positioned the middle of the hinge hole even with the aft edge skin. |
![]() |
| Since most my time was on the elevator, I only got one hinge positioned and drilled. |