May 18, 2007
Vertical Stabilizer
While waiting for new channel from Sonex, I decided to work on the leading edge of the VS.  Channel drilled to the fwrd spar fitting.
Determined not to goof like before, Grace is doing a little QC of my work.  She was very impressed with the rivet lines... I did not tell her I had pre-drilled holes to go off of (shhh).
Once everything was lined up, it was not too bad. Only two clips on this part.  It was still early in the night, so I shifted gears a little and started on the horizontal stabilizer.